GE HYBRID POWER PLANT
Location: BERLIN, MARIENFELDE
Type: Hybrid
Status: Operational
Year of establishment: 2015
Installed Capacity: 1MW (600KW FROM SOLAR AND 400KW FROM GAS)
Project Description
The GE Hybrid Power Plant is a pilot project that comprises photovoltaic, combined heat and power (CHP), and energy storage technologies.
Purpose/Application
A 200kW battery stores the surplus power during high-generation and low-consumption times.
Unique Aspect
The plant generates 1MW of power, including 600kW from solar, and the remaining from gas.