GE  HYBRID  POWER PLANT

 

Location: BERLIN, MARIENFELDE

Type: Hybrid

Status: Operational

Year of establishment: 2015

Installed Capacity: 1MW (600KW FROM SOLAR AND 400KW FROM GAS)

 

Project Description

The GE Hybrid Power Plant is a pilot project that comprises photovoltaic, combined heat and power (CHP), and energy storage technologies.

 

Purpose/Application

A 200kW battery stores the surplus power during high-generation and low-consumption times.

 

Unique Aspect

The plant generates 1MW of power, including 600kW from solar, and the remaining from gas.